In 2025, automotive clients demanded 0.02mm tolerance molds – tighter than a human hair. This forced die casting mould manufacturers to reinvent cooling channel designs. Our team at GD Weiting developed AI-powered simulation tools cutting trial cycles by 40%.
Conventional Molds | Smart Molds | |
---|---|---|
Cycle Time | 25-30s | 18-22s |
Defect Rate | 6-8% | ≤2% |
Lifespan | 80k shots | 150k+ shots |
Data source: NADCA 2024 Benchmark Report
Interestingly, our 2025 project for electrical connectors revealed an unexpected truth – sometimes reducing clamping force (from 350T to 280T) actually eliminated flash through better force distribution.
Q: How to choose between H13 and SKD61 steel?
A: Consider production volume – SKD61 lasts 2x longer for high-pressure applications per Mold Materials Handbook.
Q: What’s the lead time for custom molds?
A: Typically 12-16 weeks for complex designs, though modular systems can cut this by 30%.